#NoDAPL

‘Sabotage’ Attempts On Dakota Access Pipeline Days Before It Goes Operational

In this March 20, 2017 photo released by Mahaska County Sheriff’s Office, burned damage on the pipeline at an above-ground safety valve site southeast of Des Moines near Oskaloosa, Iowa is seen. (Mahaska County Sheriff’s Office via AP)
South Dakota — The battle was lost, but apparently the war continues on for water protectors who are still trying to stop the Dakota Access Pipeline (DAPL).

‘This Is The #NoDAPL Last Stand’: Tribe To Sue As Actions Planned Nationwide

Toyah Browneyes, left, and Lance Browneyes join opponents of the Dakota Access pipeline outside the Army Corps of Engineers offices in Los Angeles Wednesday, Feb. 8, 2017, in response to the Army Corps of Engineers saying it will clear the way for completion of the disputed $3.8 billion project to carry North Dakota oil to Illinois. (AP/Damian Dovarganes)

Trump Revives Keystone and Dakota Access Pipelines

21st Century Wire says…
Tuesday, President Donald Trump signed an executive action removing legal obstacles holding up the completion of the Dakota Access and Keystone XL pipelines.
This story will certainly be a hot button for a lot of people. Reactions will likely depend on one’s perspective on Trump, understanding of land issues, thoughts on cultural preservation, energy, US jobs, water quality and ecological harmony.