The big destroyer of theme park operations will be social distancing. When a ride vehicle comes into the loading platform, the employees may have to disinfect it, then load it with each rider separated by one or more rows. The result is that the ride that had a capacity of a 1000 people per hour is now down to 50 to 100 persons per hour. The normal two-hour wait is now multiplied.
Source